Select Real Shop-Floor Equipment Scenario (20-Year Equipment Manager SOP + M8 Fault Brain)
4 Unified Systems: Equipment + Quality + Tasks + WeFish Crisis Pre-SimulationWeFish EquipAI · Chief Equipment Director Brain
M8 Self-Learning Fault KB + M9 Calibration Interlock + M5 Spare Parts Lock
20-Year Equipment Manager Rule: Never let operators blindly boost diffusion pump power when vacuum drops! System immediately checked M9 Calibration Ledger and flagged that Pirani Gauge CAL-089 is 14 days overdue, while cold leak-rate test reached 4.8 Pa·L/s (Redline < 1.5 Pa·L/s).
Root Cause Pinpointed: Differential pressure across the Roots blower shaft lip-seal after 600+ thermal cycles caused FKM O-ring hardening. Air ingress occurs specifically when switching from roughing valve to main booster pump.
Verified `SP-VAC-019` in M5 Warehouse (2 sets in stock; triggers red low-stock purchase alert as safety stock is 3). Repair cost ($145 part + 3.5h labor) logged against M7 Monthly Maintenance Budget (currently at 68.4% utilization).
Work order cannot be closed in the system until the technician uploads: (1) Photo of removed worn shaft seal, (2) Photo of installed new seal, and (3) 30-min cold vacuum hold curve (< 0.5 Pa·L/s). Automatically updates M6 MTBF/MTTR technician KPI.
Replace Roots pump shaft Viton seal kit + Helium leak test (<0.5 Pa·L/s) + Re-calibrate Gauge CAL-089
Auto-triggered replenishment request: SP-VAC-019 dropped below safety stock (Remaining: 1 < Safety: 3)
Book a 14-Day Air-Gapped Plant Trial or Equipment Management Consultation
Direct deployment & 20-year Equipment Director advisory for NdFeB / manufacturing plants in USA, Europe, Korea, Vietnam & India.